GTD

GTD Intro

  • Anything that causes you to overreact or underact can control you, and often does.
  • Anything that doesn’t belong where it is, the way it is, is an “open loop”, which will be pulling on your attention if it’s not appropriately managed.
  • First of all, if it’s on your mind, your mind isn’t clear. Anything you consider unfinished must be captured in a trusted system outside your mind.
  • Research that significant part of your psyche cannot help but keep track of your open loops, and not as an intelligent, positive motivator, but as a detractor from anything else you need or want to think about.
  • As soon as you attach a “should”, “need to”, or “ought to” to an item, it becomes an incomplete.
  • Project list is not meant to hold plans or details about your projects themselves, nor should you try to keep it arranged by priority or size or urgency.
  • The calendar should show only the “hard landscape” around which you do the rest of your actions.
  • You will often have ideas that you will want to keep about projects but that are not necessarily next actions. Those ideas fall into the broad category of “PROJECT SUPPORT MATERIALS”.
  • One of the biggest problems with PMS is that they blend a few actionable things with a large amount of data and material that has value but no action attached.
  • When the non-actionable items aren’t properly managed, they clog up the whole process.
  • MAGIC KEY TO SUSTAINABILITY OF THE PROCESS IS THE WEEKLY REVIEW.
  • Project types:
    • Those that still have your attention even after you’ve determined their next actions.
    • Those about which potentially useful ideas and supportive details just show up ad hoc.
  • Sense of anxiety and guilt doesn’t come from having too much to do; it’s the automatic result of breaking agreements with yourself.
  • Use your mind to think about things, rather than think of them.

Defining anything in GTD

  1. Describe, in a single written sentence, your intended successful outcome for this problem or situation. [ INTENDED OUTCOME ]
  2. Write down the very next physical action required to move the situation forward. [ NEXT ACTION ]

Calendar

  1. Time Specific Actions.
  2. Day Specific Actions.
  3. Day Specific Information.

Tools

  1. Someday/Maybe Lists
  2. Tickler System

Reviewing Process

  1. All your PROJECTS, ACTIVE PROJECT PLANS, and NEXT ACTIONS, AGENDAS, WAITING FOR, and even SOMEDAY/MAYBE lists should be reviewed once a week.

Leveraging contexts

  1. Asking why a. Defines success. b. Creates decision-making criteria. c. Aligns resources. d. Motivates. e. Clarifies focus. f. Expands options.
  2. Capturing Tasks a. Full capturing. b. Clarifying and deciding actions for all the input you’ll want to externalize and capture.
  3. Incompletion Triggers a. Process the top item first. b. Process one item at a time. c. Never put anything back to “INBOX”.
  4. Record dates a. On everything that you hand off to others.

Hidden Projects

  1. Current activities.
  2. Higher-horizon interests.
  3. Current Problems, issues and opportunities.

Frequent Mistakes

  1. Not setting inbox to zero. ==> Mind doesn’t trust the system unless you take everything into the system. No papers, no anything.
  2. Not clarifying the next action. ==> Next task on filing taxes might be to call or email or discuss.
  3. Project List is not current. ==> People resist because it forces you to get clear on your larger commitments.
  4. Someday/Maybe List ==> Out of sight is out of mind. An active someday/maybe list gives us freedom to park commitments for later. Use this properly. Without one, they’ll linger in your mind or get stale on the projects list.
  5. Not taking out time to plan ==> If you don’t take time to plan, you’ll not be ready for the surprises.
  6. Putting everything on the calendar ==> Calendar is only meant for data and time specific actions/information.
  7. Taking too long to do the weekly review ==> Something’s wrong if it is taking > 1.5 hrs. Don’t use this time to clear the backlog.
  8. Not look at your lists ==> Looking at it regularly, mind learns to trust your GTD to track open loops.
  9. Investing in tools and not habits ==> Tool is not as important as building the right habits. a. Capture what has your attention. b. Clarify what it means. c. Organize where it belongs. d. Reflect regularly. e. Engage make a trusted choice.
  10. Addiction to Stress ==> Being present with what you are doing.

More nuances to the process

  • Inbox should be processed based on actionability of the item.
  • No task should be inside inbox for too long. It either needs to go to References list or needs to go to Actionable List.
  • When you put items into inbox, they can be more abstract such as “Plan to do something” but when they are going into Actionable list, the task needs to be visible and actionable.
  • Once it’s an actionable task, you decide whether it takes more than 2 minutes to do it. Overhead of tracking >2 min task is significant.
  • Try delegating the task before you start doing it.
  • Now, if the task is too big, it will go into a projects list.
  • The tasks that needs to be done immediately will go into NEXT ACTIONS list.
  • If there is a task where you are waiting for someone after delegation, it will be in WAITING FOR list. You will have a scheduled date where you check the status of that work with the person.

Projects

  • Deliverables/Intended Outcomes
  • Objectives
  • Descriptions
  • At least one actionable item so that it’s a WIP not stale meat.

Contexts

  • Tags to be put on next actions list.
  • Where action is to be done, what equipment you need to do it.
  • How many contexts and how many next actions depends on how your day is structured.
  • Agenda Contexts for Persons if there are meetings.

Calendar

  • Only have things that are time and date sensitive into the calendar.

Weekly Review

  • Make sure each project has at least one NEXT ACTION.
  • Make sure NEXT ACTION tasks are thos eyou really want to or need to do if you have time during the next week. Else, move it to SOMEDAY/MAYBE list.
  • Check SOMEDAY/MAYBE list to get anything back to action.

Trigger Lists

  • Simple keywords to navigate the week.

Read/Review Folder

  • Tasks that are not actual tasks but you could do it when you have some spare time to kill.

Tickler File

  • Physical Goods needed on a particular day such as tickets.

Kindle highlights (2020)

  • loc 550 - Anything that causes you to overreact or underreact can control you, and often does.

  • loc 573 - Anything that does not belong where it is, the way it is, is an “open loop,” which will be pulling on your attention if it’s not appropriately managed.

  • loc 580 - First of all, if it’s on your mind, your mind isn’t clear.

  • loc 580 - First of all, if it’s on your mind, your mind isn’t clear. Anything

  • loc 580 - if it’s on your mind, your mind isn’t clear. Anything you consider unfinished in any way must be captured in a trusted system outside your mind, or what I call a collection tool,

  • loc 580 - Anything you consider unfinished in any way must be captured in a trusted system outside your mind, or what I call a collection tool,

  • loc 591 - describe, in a single written sentence, your intended successful outcome for this problem or situation.

  • loc 595 - write down the very next physical action

  • loc 595 - required to move the situation forward.

  • loc 616 - “In knowledge work . . . the task is not given; it has to be determined. ‘What are the expected results from this work?’

  • loc 626 - the reason something is on your mind is that you want it to be different than it currently is,

  • loc 650 - Research has now proven that a significant part of your psyche cannot help but keep track of your open loops, and not

  • loc 651 - as an intelligent, positive motivator, but as a detractor from anything else you need or want to think about,

  • loc 676 - They need to gather everything that requires thinking about and then do that thinking if their organizational efforts are to be successful.

  • loc 686 - Instead, the key to managing all of your stuff is managing your actions.

  • loc 703 - Getting things done requires two basic components: defining (1) what “done” means (outcome) and (2) what “doing” looks like (action).

  • loc 859 - As soon as you attach a “should,” “need to,” or “ought to” to an item, it becomes an incomplete.

  • loc 887 - Let’s examine the three requirements to make the capturing phase work:

  • loc 1037 - Three things go on your calendar: time-specific actions; day-specific actions; and day-specific information

  • loc 1053 - No More “Daily To-Do” Lists on the Calendar

  • loc 1088 - There are two kinds of incubation tools that could work for this kind of thing: Someday/Maybe lists and a tickler system.

  • loc 1164 - All of your Projects, active project plans, and Next Actions, Agendas, Waiting For, and even Someday/Maybe lists should be reviewed once a week.

  • loc 1192 - There are three models that will be helpful for you to incorporate in your decision making about what to do.

  • loc 1398 - Let’s examine each of the five phases of natural

  • loc 1398 - planning and see how we can leverage these contexts.

  • loc 1413 - Here are just some of the benefits of asking why: It defines success. It creates decision-making criteria. It aligns resources. It motivates. It clarifies focus. It expands options.

  • loc 1578 - You know how shopping at a big store with lots of options lets you feel comfortable about your choice?

  • loc 1736 - Implementing the full capturing process can take up to six hours or more, and clarifying and deciding on actions for all the input you’ll want to externalize and capture in your system can easily take another eight hours.

  • loc 1753 - You’ll need to choose a physical location to serve as as your central cockpit of control.

  • loc 2196 - Incompletion Triggers

  • loc 2416 - a few basic rules to follow: Process the top item first. Process one item at a time. Never put anything back into “in.”

  • loc 2587 - The rationale for the two-minute rule is that it’s more or less the point where it starts taking longer to store and track an item than to deal with it the first time it’s in your hands—in other words, it’s the efficiency cutoff.

  • loc 2654 - It’s important that you record the date on everything that you hand off to others.

  • loc 2705 - There are seven primary types of things that you’ll want to keep track of and manage from an organizational and operational perspective:

  • loc 2706 - A Projects list Project support material Calendar actions and information Next Actions lists A Waiting For list Reference material A Someday/Maybe list

  • loc 2735 - you shouldn’t bother to create some external structuring of the priorities on your lists that you’ll then have to rearrange or rewrite as things change

  • loc 2753 - The calendar should show only the “hard landscape” around which you do the rest of your actions.

  • loc 2780 - The Most Common Categories of Action Reminders

  • loc 2979 - The Projects list is not meant to hold plans or details about your projects themselves, nor should you try to keep it arranged by priority or size or urgency—it’s

  • loc 3007 - the Weekly Review is the critical success factor for marrying your larger commitments to your day-to-day activities

  • loc 3018 - There are three primary areas in which you are likely to have “hidden” projects: Current activities Higher-horizon interests and commitments Current problems, issues, and opportunities

  • loc 3142 - you will often have ideas that you’ll want to keep about projects but that are not necessarily next actions. Those ideas fall into the broad category of “project support materials,”

  • loc 3186 - one of the biggest problems with most people’s personal management systems is that they blend a few actionable things with a large amount of data and material that has value but no action attached.

  • loc 3189 - When the nonactionable items aren’t properly managed, they clog up the whole process.

  • loc 3203 - What follows is a brief discussion of some of the most common. General-reference filing—paper, e-mail, and simple digital storage Large-category filing Contact managers Libraries and archives

  • loc 3226 - As a rule, it’s best to stick with one general-reference system except for a very limited number of discrete topics.

  • loc 3456 - here’s a list of some of the topics of checklists I’ve seen and used over the years:

  • loc 3513 - Frankly, if your calendar is trustworthy and your action lists are current, they may be the only things in the system you’ll need to refer to more than every couple of days.

  • loc 3531 - the magic key to the sustainability of the process is the Weekly Review.

  • loc 3547 - here is the three-part drill that can get you there: get clear, get current, and get creative.

  • loc 3970 - I recommend that you make and keep a list called “Areas of Focus.”

  • loc 4092 - There are two types of projects, however, that deserve at least some sort of planning activity: (1) those that still have your attention even after you’ve determined their next actions, and (2) those about which potentially useful ideas and supportive detail just show up ad hoc.

  • loc 4279 - The sense of anxiety and guilt doesn’t come from having too much to do; it’s the automatic result of breaking agreements with yourself.

  • loc 4290 - three options for dealing with them and eliminating the negative consequences: Don’t make the agreement. Complete the agreement. Renegotiate the agreement.

  • loc 4374 - use your mind to think about things, rather than think of them.

  • loc 4693 - the two essential elements of this art: defining what done means and what doing looks like.

  • loc 4818 - your mind is designed to have ideas, based upon pattern detection, but it isn’t designed to remember much of anything!

  • loc 4897 - When you make plans (implementation intentions) ahead of time and decide what actions will be carried out in which contexts, the proper behavior is nearly automatically enacted instead of being drawn from your limited reserve of willpower.

  • loc 5080 - Pressure Produces Greater Rather Than Reduced Utilization of These Practices